The first few pieces of drywall we put up in the back extension.

A maze of septic lines.

Installing a ventilation fan.

Siding at last!

We took off today to get a wiring & plumbing inspection. Two to four inches of snow was expected for the past 24 hours. There was an inch on the ground this morning.
_thumb.jpg)
When we left at 4:30 there was 10 inches. The inspector cancelled.
_thumb.jpg)
It took us about an hour to get out of this... problem.
_thumb.jpg)
Four hours in to our normal two and a half hour drive and we're halfway home, crawling along I-5 at 25 mph.