Floors & a toilet

Neil preparing the back extension floor for linoleum.

IMG_0969

Sara spreading adhesive for the cork flooring in our bedroom.

IMG_1035

Bedroom cork floor

IMG_1039

Picture break after setting up the solar panel pole after some digging and rebar installation before a concrete pour.

IMG_1054

Neil’s bedroom cork floor

IMG_1068

Sara painting the front steps

IMG_1071

Tile installation in the front entry & stove area

IMG_1108

The septic drain field…

IMG_1120 (1280x960)

… and the now buried septic tanks – and pump electrical components (our sandy soil requires using a pump)

IMG_1146 (1280x960)

We tiled and side a small porch by the front door – we still have to tile the rest of the front porch.

IMG_1154 (960x1280)

Inside completed tile

IMG_1156 (1280x960)

The ‘Kitchen Queen’ – our fire stove/oven

IMG_1213 (1280x960)

Nachos – our first dome stove cooked meal!

IMG_1221 (1280x960)

A bed!  WAY more comfortable than a (slowly deflating) air mattress!

IMG_1224

Thanksgiving dinner in/on the Kitchen Queen.  The Brussels sprouts were the best I’ve ever had – picked earlier in the day from our garden at home in Kirkland.

IMG_1286

And we can finally make use of the septic system – we have a (partially) working toilet.  (no running water quite yet…)

IMG_1289