Gradual Inside work

Finishing the second floor flooring, doing wiring, plumbing, and stub walls have taken up most of the year so far. 

019247

We had several bonfires in the spring as we slowly burned one of the two brush piles.

019261

019283

A late spring blowdown that took a few hours to clear

019289

We brought a sick chicken one weekend.

019291

 

019318

 

019339 (853x1280)

019828

019616 (1280x960)

We finally got around to painting the shed with a little help.

020142

Plenty of wood for weekend visits this winter…

020145

020157

Our PEX plumbing central manifold where we can control individual feeds.

020165

IMG_0733

Next we’ll have pictures of the siding outside and septic plumbing inside!