Download (11.5 mb)
Download (17.5 mb)
Download (21 mb)
Download (22 mb)
Download (25 mb)
Download (18 mb)
We started the back extension.
Download (13 mb)
Clean up day. We are finally going home.
Download (11 mb)
Time to climb on top and install the cupola. In addition, some of the rear riser wall paneling is being installed.
Download (30 mb)
Download (24 mb)
This was supposed to be the dome raising day but we were a day behind schedule. Instead we finished up the subfloor and installed the dome riser walls.
Download (xx mb)
More "joisting". We also closed up the last part of the foundation wall that we were using for easy access.
Download (27 mb)
Joists, joists, and more joists! My brother and nephew as well as Mike's dad arrived today to help out.
Download (28 mb)
Download (20 mb)
Download (15mb)