June 28th Video

Time to climb on top and install the cupola. In addition, some of the rear riser wall paneling is being installed.

Published
Categorized as Videos

Wrapping Up

Another day, another shower. This time we are using Mary Kay and Tony’s hotel room. Much to my amazement we managed to get all of the skylights installed. Tony crafted a platform for everyone to stand on while hoisting them up. There was one problem – The kitchen window was mismarked (56" instead of 51")… Continue reading Wrapping Up

A Chance to Post

It’s been a crazy week but I finally have a chance to sit down and write. Right now we’re sitting down to a lunch of corn chowder and grilled cheese sandwiches. The dome has 22 more panels left to put on and the front and back extensions still need to be framed. The back is… Continue reading A Chance to Post

Published
Categorized as Dome

June 25th Video

More paneling! We also framed some of the open riser wall sections.

Published
Categorized as Videos

June 23 Video

The frame is built, time to get more of those pesky panels up.

Published
Categorized as Videos