Garlic

  Assembling the solar panels Fall 2013 harvest The ‘monster’ inverter and completed battery box in the back extension. A working sink! Working on trim on the ceiling Sara working on staining cabinets & drawers We haven’t made it to the dome as much since Neil bought a restaurant.  Neil trying to get a better… Continue reading Garlic

Water & Power

We had some bad luck early this year – our secondary septic tank popped up out of the ground (saturated soil + an empty tank) Staining bathroom and panty cabinets The first room with completed trim – the bathroom.  On the left is the instant water heater. The septic tank re-buried – with a boulder… Continue reading Water & Power

Published
Categorized as Pictures

Floors & a toilet

Neil preparing the back extension floor for linoleum. Sara spreading adhesive for the cork flooring in our bedroom. Bedroom cork floor Picture break after setting up the solar panel pole after some digging and rebar installation before a concrete pour. Neil’s bedroom cork floor Sara painting the front steps Tile installation in the front entry… Continue reading Floors & a toilet

Gradual Inside work

Finishing the second floor flooring, doing wiring, plumbing, and stub walls have taken up most of the year so far.  We had several bonfires in the spring as we slowly burned one of the two brush piles. A late spring blowdown that took a few hours to clear We brought a sick chicken one weekend.… Continue reading Gradual Inside work

Published
Categorized as Pictures

Inside Synth

40 pictures of the inside with the ceiling panels in – just before we started walls. Full Screen

Published
Categorized as Pictures